Rotor management hardware update

In the time we are building on the PCB with the electronics (for PIC controler) I had to bring the old hardware inside a new box. Also the rotation of the Antenna rotor I have to do by hand. But safety first .. the old hardware is build together in a plastic ‘box’ with on top space for the future electronincs.
See the results on the next pictures.

Rotor house  Rotor house 2  Rotor house finish
.: First start                                                                                                 .: Meantime box ready